Engineering Experience Across Roads, Structures, Bridges, Safety & Transportation Infrastructure
At Civilified Infra Consultant Pvt. Ltd., our project portfolio reflects a multidisciplinary approach to infrastructure engineering. Since our establishment, we have undertaken assignments covering highway design, DPR preparation, bridge and structural engineering, proof checking, Road Safety Audit, traffic engineering, pavement design, surveys, hydrology, drainage and cost engineering. Our experience spans national highways, state highways, strategic and high-altitude roads, ROBs, VUPs/LVUPs, bridges, junctions, river-bank protection works and urban transportation infrastructure across
multiple states and Union Territories. The portfolio includes projects undertaken for government authorities, NHAI, PWDs, Border Roads Organisation and other infrastructure agencies.
The following table presents our project experience, including project duration, project scope and length, appointment, project cost, Civilified’s role, and the client/authority. The project information has been compiled from the Key Projects section of the company profile.
| S. No. | Duration | Name of the Project | Appointed as | Brief Description of the Project | Client Name |
|---|---|---|---|---|---|
| 1 | Dec 2022 – May 2025 | Construction & Upgradation of Khalsar–Agham Shyok Road under Project Himank, Ladakh – 8.96 km | Design Consultant | Upgradation of the existing road to NHDL specifications, including minor bridges and associated highway infrastructure. | Border Roads Organisation, Project Himank, Leh |
| 2 | Apr 2026 – Ongoing | Construction of VUP at Pandharkawada Y-Junction on NH-44, Maharashtra | Design Consultant | Construction of a VUP and associated LUVP, box culverts and drainage structures at a major highway junction. | NHAI–PIU Chandrapur |
| 3 | Sep 2025 – Ongoing | Upgradation of Kargil–Dumgil (Batalik Road), Ladakh – 14.59 km | Design Consultant | Upgradation of the high-altitude road to NHDL specifications with highway, pavement, safety and roadside facility design. | Chief Engineer, Project Vijayak, Kargil |
| 4 | Jan 2026 – Ongoing | Slope Stabilisation of Indus River Banks at Numu Military Station, Ladakh – 236 m | Design Consultant | Stabilisation and protection of river banks through geotechnical assessment and retaining structure design. | Chief Engineer, Project Vijayak, Kargil |
| 5 | Jan 2022 – Jul 2022 | DPR for Four-Laning of Panchkula–Morni Road MDR-118 – 10.84 km | Design Consultant | Development of a four-lane greenfield road connecting NH-7 to NH-5 via Chaunki, Ghumthala and Kaushalya Dam, including bridge and drainage structures. | PWD (B&R), Panchkula, Haryana |
| 6 | Jan 2022 – Apr 2022 | DPR for Widening of Mattewall–Toka Road / Shri Guru Gobind Singh Ji Marg-II – 3.50 km | Design Consultant | Widening and improvement of the existing two-lane road with associated culverts, retaining structures and safety improvements. | PWD (B&R), Panchkula, Haryana |
| 7 | Mar 2023 – Apr 2023 | Strengthening of Pinjore–Baddi Road – 1.20 km | Design Consultant | Strengthening and geometric improvement of the road section, including paved shoulders and associated highway works. | PWD (B&R), Panchkula, Haryana |
| 8 | Sep 2022 – Feb 2024 | DPR for PMGSY-III Batch III Roads in Rajpura–Patiala Area – 11.87 km | DPR Consultant | Preparation of DPRs covering surveys, investigations, geometric and pavement design, safety assessment and cost estimation for three rural road sections. | PWD (B&R), Patiala |
| 9 | Apr 2024 – Ongoing | Construction of 2-Lane ROB with Footpath at LC 62-A, Dhuri, Sangrur | Design Consultant | Development of a two-lane railway over bridge with footpath, approaches, junction improvements and associated structural works. | PWD, Sangrur, Punjab |
| 10 | Jun 2026 – Ongoing | 100 m × 7 m Pedestrian Steel Footbridge Bridge at Plaksha University, Mohali | Design Consultant | Structural design of a pedestrian steel bridge connecting two existing university buildings, including foundations and steel connections. | Plaksha University, Mohali |
| 11 | Mar 2025 – Jul 2025 | High-Level Bridge over Pandori–Btl Shri Hargobindpur Road, Gurdaspur – 2 × 13 m | Design Consultant | Design of an RCC T-beam high-level bridge with pile foundation and associated structural and civil works. | PWD, Bathinda, Punjab |
| 12 | Mar 2025 – Jul 2025 | High-Level Bridge on Mehta–Shri Hargobindpur Road to Bolewal Road, Gurdaspur – 2 × 15 m | Design Consultant | Design of an RCC T-beam bridge with pile foundation, including structural calculations and construction drawings. | PWD, Bathinda, Punjab |
| 13 | Mar 2025 – Jul 2025 | High-Level Bridge over Dalla Drain on Qadian–Harchowal Road, Gurdaspur – 2 × 15 m | Design Consultant | Design of a high-level RCC T-beam bridge over Dalla Drain with pile foundation and associated engineering documentation. | PWD, Bathinda, Punjab |
| 14 | Mar 2025 – Jul 2025 | High-Level Bridge over Kahnuwan Swamp Drain, Gurdaspur | Design Consultant | Design of a high-level bridge under PMGSY-III, including structural analysis, foundation design and construction documentation. | PWD, Bathinda, Punjab |
| 15 | Mar 2025 – Jul 2025 | High-Level Bridge on Shri Hargobindpur–Nainekot Road, Gurdaspur – 3 × 12.5 m | Design Consultant | Design of an RCC high-level bridge with pile foundation and associated structural and engineering works. | PWD, Bathinda, Punjab |
| 16 | Feb 2026 – Ongoing | Special Repair Road Estimates in Gharaunda–Indri–Nilokheri Constituency – 91.85 km | Design Consultant | Traffic, pavement and condition assessment based preparation of estimates and DPR for special repair works across the road network. | Zila Parishad, Karnal |
| 17 | Mar 2026 – Ongoing | Special Repair Road Estimates in Assandh Constituency – 37.65 km | Design Consultant | Preparation of road repair estimates based on traffic volume, CBR, road condition and engineering investigations. | Zila Parishad, Karnal |
| 18 | Apr 2026 – Ongoing | Special Repair Road Estimates in Palwal–Prithla–Hodal–Hathin Constituency – 37.44 km | Design Consultant | Engineering assessment and preparation of estimates and DPR for identified road special repair works. | Zila Parishad, Karnal |
| 19 | Jun 2025 – Ongoing | Addition & Alteration of Kalika Mata Mandir, Kalka | DPR & Project Consultant | Architectural and engineering consultancy for temple addition and alteration works, including structural design and retaining structures. | Shri Mata Mansa Devi Shrine Board, Panchkula |
| 20 | Feb 2026 – May 2026 | Saharanpur–Kurukshetra Road Improvement – 20 km | DPR Consultant | Topographical survey, road assessment and preparation of DPR for a two-lane road with paved shoulders. | PWD (B&R), Yamuna Nagar |
| 21 | Apr 2026 – Ongoing | Strengthening of Gharaunda–Phurlak Road | DPR Consultant | Preparation of DPR for strengthening and improvement of the road under the Model Road Project. | PWD (B&R), Karnal |
| 22 | Nov 2023 – Jun 2024 | Construction of Minor Bridges at Vijay Rattan Chowk & Kabadi Bazaar Chowk, Ambala Cantt. | DPR Consultant | Preparation of DPR and structural design for minor bridges and associated civil infrastructure. | Municipal Council, Ambala Sadar |
| 23 | Apr 2025 – Aug 2025 | Strengthening of Jagadhari–Ambala Road to Khuda–Dhukheri Link Road – 5.60 km | DPR Consultant | Strengthening and improvement of the existing road corridor through surveys, pavement design, safety assessment and DPR preparation. | Haryana PWD (B&R), Naraingarh |
| 24 | Dec 2025 – Feb 2026 | Improvement of Naraingarh–Sadhaura Junction at Ambli Harbon | DPR Consultant | Traffic assessment and engineering improvement of a signalized/non-signalized junction for improved capacity and safety. | PWD (B&R), Naraingarh |
| 25 | May 2026 – Jul 2026 | DPR for Kalka–Paploha Road – 6.00 km | DPR Consultant | Preparation of DPR including surveys, investigations, road safety, geometric and pavement design and cost estimation. | PWD (B&R), Panchkula |
| 26 | May 2026 – Jul 2026 | DPR for Strengthening of Pinjore–Kalka Road – 5.60 km | DPR Consultant | Strengthening and improvement of the existing road through detailed surveys, pavement assessment, geometric design and DPR preparation. | PWD (B&R), Panchkula |
| 27 | Jul 2026 – Ongoing | Improvement of Kona–Khol Mola Road, Kalka, Panchkula | DPR Consultant | Preparation of DPR for improvement of the existing road, including surveys, investigations, geometric and pavement design. | PWD (B&R), Panchkula |
| 28 | Jul 2026 – Ongoing | Improvement of Khol Fateh Singh Road, Kalka, Panchkula | DPR Consultant | Engineering assessment and preparation of DPR for improvement and upgrading of the existing road. | PWD (B&R), Panchkula |
| 29 | Oct 2025 – Feb 2026 | Improvement of Various Junctions on Sector Dividing Roads, Panchkula | DPR Consultant | Traffic and engineering assessment with layout and estimation for improvement of signalized and non-signalized junctions. | PMDA, Panchkula |
| 30 | Oct 2025 – Feb 2026 | Traffic Survey & Analysis for Mazri Chowk and Bhagwan Parshu Ram Chowk, Panchkula | DPR Consultant | Traffic surveys, capacity analysis and engineering assessment for improvement of major urban intersections. | PMDA, Panchkula |
| 31 | Oct 2024 – Ongoing | Construction of Nidder–Kyun–Tso–Punguk Road, Ladakh – 27 km | Proof Consultant | Independent proof checking of highway, bridge, culvert, pavement, drainage and geotechnical designs for a strategic high-altitude road. | Border Roads Organisation, Project Himank, Leh |
| 32 | Dec 2023 – Mar 2026 | Construction of LVUP & VUPs on NH-58, Beawar–Gomti Section – 50.36 km | Proof Consultant | Independent review and proof checking of highway and grade-separated structures with associated safety and drainage provisions. | PWD NH Circle, Jaipur |
| 33 | Apr 2024 – Ongoing | Construction of Hanle–Zursar–Imisla Road, Ladakh – 48 km | Proof Consultant | Independent proof checking of a high-altitude highway project including pavement, bridge, drainage and geotechnical designs. | Border Roads Organisation, Project Himank, Leh |
| 34 | Jan 2024 – Mar 2025 | Road Safety & Flood Damage Repair on NH-703A, Punjab – 6.80 km | Proof Consultant | Proof checking of highway and associated structural, drainage and geotechnical designs for flood damage repair and safety improvement. | PWD (B&R), NH Division, Jalandhar |
| 35 | Jan 2024 – Ongoing | Construction of ROB in lieu of Railway Crossing E/2, Ferozepur – NH-05 | Proof Consultant | Independent design review and proof checking of a railway over bridge and associated highway infrastructure. | PWD (B&R), NH Division, Firozpur |
| 36 | Jul 2025 – Ongoing | Construction of Four Bridges on NH-05, Himachal Pradesh | Proof Consultant | Independent proof checking of four major bridges with spans ranging from 35 m to 125 m and associated structural works. | HP PWD, NH Circle, Shimla |
| 37 | Sep 2026 – Ongoing | Improvement of NH-505, Sumdo–Kaza–Gramphoo Road – 35.03 km | Proof Consultant | Proof checking for upgrading an existing Class-5 road to NH intermediate-lane specifications with hard shoulders. | Chief Engineer, Project Deepak |
| 38 | Jan 2025 – Ongoing | 45 m Wide Approach Road from NH-44 to IMC Rajpura with HL Truss Bridge – 5.56 km | Proof Consultant | Independent review of the approach road and dual-carriageway high-level truss bridge, including structural and highway components. | GMADA, SAS Nagar, Punjab |
| 39 | Apr 2026 – Ongoing | 70 m Steel Truss Bridge over Mandakini River on NH-107, Uttarakhand | Proof Consultant | Independent proof checking of a long-span steel truss bridge and associated structural design. | PWD, National Highway Circle, Dehradun |
| 40 | Jul 2025 – Mar 2026 | Special Repairs on NH-705 & NH-05, Himachal Pradesh | Road Safety Consultant | Road safety assessment for retaining walls, breast walls, wire crates, U-drains and rectification of settled road sections. | HP PWD, Shimla |
| 41 | Jul 2022 – Sep 2023 | T-Junction Improvement & Right-Turning Flyover, Panchkula | Safety Consultant | Road safety audit and safety management for junction improvement, flyover and widening of at-grade roads. | NHAI–PD Chandigarh |
| 42 | May 2022 – Sep 2022 | Upgradation of Tangtse–Lukung Road, Project Himank – 14 km | Safety Consultant | Road safety audit and construction-stage safety assessment for upgrading the strategic high-altitude road to NHDL specifications. | Border Roads Organisation, Project Himank, Leh |
| 43 | May 2022 – Sep 2022 | Upgradation of Tangtse–Lukung Road, Project Himank – 11 km | Safety Consultant | Road safety audit and construction safety services for the second section of the Tangtse–Lukung road. | Border Roads Organisation, Project Himank, Leh |
| 44 | Nov 2021 – Ongoing | Upgradation & Strengthening of NH-354, Punjab – 63.27 km | Safety Consultant | Road safety audit and safety management for upgrading the highway to two lanes with paved shoulders and strengthening existing pavement. | PWD (B&R), NH Division, Ferozepur |
| 45 | Apr 2021 – Mar 2024 | Strengthening of Pathankot–Banikhet Road, NH-154A – 39.36 km | Safety Consultant | Road safety auditing and construction-stage safety management for strengthening of the national highway corridor. | PWD (B&R), NH Division, Pathankot |
| 46 | Mar 2022 – Apr 2023 | Strengthening of NH-703A, Jalandhar – 13.40 km | Safety Consultant | Road safety audit and safety management for strengthening multiple highway sections and associated infrastructure. | PWD (B&R), NH Division, Jalandhar |
| 47 | Jan 2022 – Sep 2022 | Construction of 2-Lane Service Road at Patiala–Sanaur Junction | Safety Consultant | Road safety audit and construction-stage safety assessment for a new service road and associated VUP junction interface. | NHAI–PD Patiala |
| 48 | Mar 2022 – Feb 2023 | Strengthening & Road Safety Improvement of Pathankot–Kullu Road – 12.19 km | Safety Consultant | Road safety auditing and construction safety management for highway strengthening and safety improvement works. | PWD (B&R), NH Division, Pathankot |
| 49 | Jul 2022 – Apr 2023 | Permanent Rectification of Black Spot through VUP, Ferozepur – 1.18 km | Safety Consultant | Road safety assessment and safety management for permanent black-spot rectification through construction of a VUP. | PWD (B&R), NH Division, Ferozepur |
| 50 | Oct 2024 – Apr 2024 | Reconstruction of Damaged Major Bridge on NH-73, Haryana – 41.79 km | Safety Consultant | Road safety audit and safety management associated with reconstruction of a damaged RCC T-beam bridge and approaches. | NHAI–PD Chandigarh |
| 51 | Apr 2023 – Mar 2024 | Improvement of Zirakpur–Parwanoo NH-05 Section with Two VUPs – 1.50 km | Safety Consultant | Road safety audit for improvement of an existing four-lane highway section and construction of two VUPs. | NHAI–PD Chandigarh |
| 52 | Jul 2024 – Jan 2026 | Construction of 4-Lane LVUP at Sector-26 Panchkula – 1.25 km | Safety Consultant | Road safety audit and construction safety management for a grade-separated underpass and associated highway works. | NHAI–PD Chandigarh |
| 53 | Jun 2024 – Ongoing | Construction of Chumthang–Chusul Road, Ladakh – 25 km | Safety Consultant | Road safety auditing and construction-stage safety management for development of a strategic NHSL-specification road. | Border Roads Organisation, Project Himank, Leh |
| 54 | Feb 2025 – Ongoing | Construction of Underpass at Gaur Chowk, Greater Noida | Safety Consultant | Road safety audit and construction-stage safety management for a major urban underpass with associated approaches and traffic arrangements. | Greater Noida Industrial Development Authority |
| 55 | Jul 2023 – Nov 2024 | Chusul–Dungti–Fukche–Demchok Road, Ladakh – 46.40 km | Safety Consultant | Road safety audit and construction safety management for strategic single-lane highway development, including two minor bridges. | Border Roads Organisation, Project Himank, Leh |
| 56 | May 2025 – Ongoing | Upgradation of Ratlam–Jhabua Road, Madhya Pradesh – 99.80 km | Safety Consultant | Road safety auditing and safety management for upgradation of a major state highway corridor under NDB loan package. | MP Road Development Corporation, Indore |
| 57 | Jul 2025 – Ongoing | Rectification of Five MORTH-Identified Blackspots on NH-52, Rajasthan – 7.58 km | Safety Consultant | Road safety audit and safety management for engineering rectification of identified highway blackspots. | NHAI–PIU Jaipur |
| 58 | Jan 2024 – Ongoing | Construction of 2-Lane ROB over LC No. S-53/T-2 on NH-703A | Safety Consultant | Road safety audit and construction-stage safety management for a two-lane railway over bridge. | PWD (B&R), NH Division, Jalandhar |
| 59 | Mar 2024 – Dec 2025 | LUP & LVUP Works on Panipat–Jalandhar NH-44 Section | Safety Consultant | Road safety audit and construction safety management for LUP/LVUP and associated highway works. | NHAI–PIU Ambala |
| 60 | As per source document | Widening & Upgradation of Sri Muktsar Sahib–Malout Road, NH-354 – 27.66 km | Safety Consultant | Road safety audit and construction safety management for widening to two lanes with paved shoulders and associated highway improvements. | PWD (B&R), NH Division, Abohar |
| 61 | Jul 2026 – Ongoing | Long-Term Remedial Measures for River Cut/Bank Erosion on Kullu–Manali NH-03 | Safety Consultant | Road safety assessment and safety management for long-term river-bank protection and remedial works at identified erosion locations. | NHAI–PD PIU Mandi |
| 62 | Jul 2026 – Ongoing | Remedial Measures for River Cut/Bank Erosion on Kullu–Manali NH-03 | Safety Consultant | Road safety assessment for river-bank protection works at multiple erosion-prone locations along the highway corridor. | NHAI–PD PIU Mandi |
| 63 | Dec 2025 – Ongoing | Construction of 2-Lane ROB in lieu of LC-80, Neem Ka Thana, Rajasthan | Safety Consultant | Road safety audit for the proposed ROB and approaches, including review of geometry, traffic circulation, signage and safety provisions. | PWD, Circle–Sikar |
| 64 | Apr 2025 – Dec 2025 | External Road Connectivity to MMLP Jalna, Maharashtra | Safety Consultant | Road safety audit for external road connectivity, junctions, access control, freight movement and associated highway safety infrastructure. | Maharasht |
Our project experience reflects our capability across the complete infrastructure project lifecycle — from surveys, feasibility studies and DPR preparation to detailed design, structural engineering, proof checking, road safety auditing and construction-stage consultancy. Our assignments cover challenging terrains and diverse infrastructure requirements, including high-altitude roads in Ladakh and Himachal Pradesh, national and state highways, bridges, ROBs, VUPs/LVUPs, urban junctions and specialised structural works.